How? Bad formulas on an Excel spreadsheet.

Bethany Barnes:

Portland Public Schools teaches children math as complex as calculus, but made a simple arithmetic mistake potentially worth millions and tried to keep the error secret.

Portland Public Schools flubbed basic addition and awarded the bid to plan the $146 million redesign of Madison High School to the wrong firm, giving the important design contract to the bidder that the official district vetting team rated second-best.

How? Bad formulas on an Excel spreadsheet.

Losing the project was a devastating to partners Opsis Architecture and Dao Architecture. In their bid proposal, Opsis, a larger, more established firm, joined with Dao, a minority-woman owned firm, as a way to increase equity in the architecture profession. The team had done the master plan for the high school and felt invested in the Madison community.


Fast Lane Literacy by sedso